Long Wall Road closed starting today for asphalt resurfacing

Long Wall Road closed starting  today for asphalt resurfacing

The resurfacing project involves a full road closure from 7:00am to 4:00pm starting Monday.

 

PHILIPSBURG--The Ministry of Public Housing, Spatial Planning, Environment and Infrastructure VROMI has announced that the resurfacing of Long Wall Road will start on Monday, October 28.

The work schedule for the Long Wall Road resurfacing project involves a full road closure from 7:00am to 4:00pm each day, during which crews will be actively milling and paving the roadway. At night, the road will reopen, allowing vehicles to travel on the milled section.

The project, managed by Windward Roads Infrastructure, will proceed in phases, beginning with milling the existing roadway before laying new asphalt.

To reduce disruption, drivers are advised to use Walter Nisbeth Road, A.T. Illidge Road, and Prins Bernard Bridge as alternate routes. Please plan ahead and allow extra travel time.

The VROMI Ministry thanks the public for their cooperation and asks everyone to observe detour signs and the work schedule to ensure a safe, timely project completion.

The Daily Herald

Copyright © 2020 All copyrights on articles and/or content of The Caribbean Herald N.V. dba The Daily Herald are reserved.


Without permission of The Daily Herald no copyrighted content may be used by anyone.

Comodo SSL
mastercard.png
visa.png

Hosted by

SiteGround
© 2024 The Daily Herald. All Rights Reserved.